Description:

Design review and construction supervision of the existing 13.5 Million m3 dam and 155 ha irrigation scheme ; Rehabilitation of the Spill way, embankment and off take pipes, 1000mm- DN300mm DN main Pipeline; 200mm DN-120mm DN secondary pipelines; Warehouse and offices, Access bridges and staff houses